2MV Christmas and New Year Network Operations 2016/2017

Christmas 2012

Christmas and New Year Network Operations 2016/17 for TPN (The Pallet Network)

Please find below the operational arrangements either side of the Christmas break:

  • The last trunks into the Hub prior to Christmas will be on Friday 23rd December 2016.
  • All freight input on Friday 23rd December 2016 on a ND service is scheduled to be delivered on Tuesday 03rd January 2017.
  • All freight input on Friday 23rd December 2016 on an EC service will be scheduled to be delivered on or by Wednesday 04th January 2017 unless on a D/Day service which will be delivered on the specified day.
  • If you require freight to be delivered on Saturday 24th December 2016, this should be on either a TIME/BKSL or AM service and MUST be pre-advised to 2MV with as much notice as possible (this service is subject to delivering depot approval)

Should you require freight to be delivered between Christmas and the New Year, this should be negotiated with the 2MV with as much notice as possible. This service will only be available subject to the delivering depot having suitable resource.

Also please be reminded you that our Scottish Depots will not return to work until Wednesday 04th January 2017.

Christmas and New Year Network Operations 2015/16 for The Hazchem Network

Please see details below for the Christmas/New Year operations schedule for the Hazchem Network.

Any deliveries over the Christmas period must be pre-arranged with 2MV Logistics, as some depots may be operating a reduced service over the festive period.

  • 22/12/16 – normal operation / trunking:
    • ND consignments will be routed for delivery 23/12/16
    • EC consignments will be routed for delivery 03/01/17
  • 23/12/16 – normal operation / trunking:
    • ND consignments will be routed for delivery 03/01/17
    • EC consignments will be routed for delivery 04/01/17
  • 24/12/16 – hub closed: if you require a delivery through the network on 24/12/16, this must be pre-arranged with 2MV before 22/12/16. This service is subject to availability, and additional costs may apply.
  • 03/01/17 – normal operations / trunking

Should you require you require a delivery between 24/12/16 and 03/01/17, this must be pre-arranged with 2MV, and the consignment will need to be trunked to the hub latest Fri 23rd December.

News